Schedule of Fittings and PC Items

With panelBUILD, the requirements for dealing with the selection and nomination of fittings and PC items are no different to those for conventional building methods - except in one critical area – TIMING.

With conventional construction, often the final selection of fittings may not occur until well into the construction phase. With panelBUILD, it must be finalised much earlier.

Before we can commence programming of cutting and pre-fabrication information into our computer, we need comprehensive details on all fittings and their precise location. This is necessary to ensure correct size holes are accurately located and appropriate backing plates, support framing and fitting feed services are all incorporated prior to panel cavities being sheeted.

Apart from the more obvious of taps and light fittings, this same requirement applies equally to :

  • television cabling
  • security monitoring equipment
  • sound systems
  • internet services
  • all low voltage fittings
  • indoor switching of outdoor devices

All aspects of fitting selection and outlet locations must be finalised early.

The Schedule of Fittings and PC Items which we require must be comprehensive. For any items which are not specified, we will quote for a product from our preferred options for that item.

To assist builders in this regard, panelBUILD has a “check list” which is provided at the time a quotation is requested.